Book a 30 minute demo.
See the Circuit and Infrastructure calculators on a real design, ask anything about method or BS 7671 compliance, and leave knowing whether CurrentProof fits how you work.
What we will cover
A final circuit end to end in Circuit
Cable sizing, volt drop, earth fault loop and every compliance check, with the table and equation each value came from.
A small distribution network in Infrastructure
Supply, feeders and boards calculated together, with cumulative volt drop and fault levels down the tree.
How reports and saved calculations fit a working day
Bring a design you have already done in your current software and we will run the same circuit side by side.
Pick a time
If the calendar does not load, open the booking page in a new tab.
Prefer to try it yourself first? The three free calculators need no account.