BS 7671:2018+A4:2026

Compliant on paper. Buildable on site.

CurrentProof is the BS 7671 design platform built around a question the others do not ask: can this actually be installed? Whole network design checking today, with the constructability family shipping check by check.

Public beta: every calculator, Circuit and Infrastructure included, is free until 28 February 2027. No card needed. Create an account

A 230 V supply, a sub-main to DB1 and two final circuits, drawn and specified in the calculator. The 50 m socket circuit fails its 5% volt drop limit at 8.0%. At 6 mm² it passes at 3.5%, and the report is ready. Data entry is shown at 4× speed.
The difference

Compliance is the price of entry. Constructability is the reason to buy.

Every tool in this market checks a design against BS 7671. None of them checks whether the thing you have drawn can be installed in the building it is going into. That gap is where the phone calls come from, and it is the gap CurrentProof is built to close.

Live today

  • Terminal capacity advisory, on the Circuit calculator. Select an MCB with a cable above 35 mm² and it warns you the cable may not fit the breaker terminal. It works from a typical device rating rather than the specific device, and the product labels it as an advisory.

In build

Not yet available
  • Cable type against the premises. Standard cable where low smoke zero halogen is required.
  • Bending radius and containment capacity. The bend that cannot be achieved in the space it was drawn into.
  • Switchboard access. The board that cannot get into the room.
Designed for Rail Telecoms Building Services Renewables
Built by a qualified electrical engineer registered with the IET

What you get, before you sign up

The three free calculators work without an account. These are the screens you'll use, with real numbers from the engine.

Volt Drop result of 5.263 V, 2.29%, compliant, with the Eq 12 working, the Appendix 4 Equation 6 temperature correction and the BS 7671 table references.

The working, not just the answer

Every input, factor and equation, with the table each value came from.

Volt Drop result of 13.159 V, 5.72%, marked non-compliant against an 11.50 V maximum.

A fail is shown as a fail

Run the cable past the Table 4Ab limit and the result turns red, with the limit beside it.

Load schedule with diversified totals of 226.78 A, 175.10 A and 175.10 A per phase, 17.9% phase imbalance, and two distribution boards.

Every board on one schedule

Connected and diversified load per phase, with the phase imbalance worked out for you.

Every value, traced to its table.

A spreadsheet won't tell you when a lookup came from the wrong table. CurrentProof cites every one, and if a check can't be evaluated, the result says so. It never reports a pass in its place. Got a result from another tool you can't verify? Run it here and see every factor.

01

Define your circuit and cable

Choose installation method, conductor material, and cable reference from the A4:2026 tables, with buried cables split into Methods D1 and D2.

Table 4A1 · Table 4A2 · Table 4A3

02

Enter installation conditions

Provide ambient temperature, grouping arrangements and circuit length. Correction factors are applied automatically.

Appendix 4 Eq 6 (Ct) · Table 4B1 (Ca) · Table 4C1 (Cg)

03

The result, with the working

A pass or fail against Table 4Ab, with every intermediate value and the reference it came from.

Table 4Ab · BS 7671:2018+A4:2026 Appendix 4

Start free. Upgrade when you need more.

Starter

£0/ forever
  • Volt Drop calculator
  • Demand calculator
  • Load calculator
  • Unlimited calculations
  • Full working shown
  • Tables from BS 7671:2018+A4:2026
  • – PDF export
  • – Advanced calculators
Create free account

Professional

£590/ seat / year

or £59 per seat per month · further seats cost less

  • Everything in Starter
  • Circuit and Infrastructure calculators
  • PDF reports with the full working, ready for checking
  • Calculation history
  • Saved projects
  • Priority support
See Professional plans

Cancel anytime: you move to Starter and keep every calculation and project. The free calculators stay free, with no ads. Full pricing details →

Check your next volt drop here.